INSTALLATION GUIDE


INSTALLATION VIDEO - HOW TO INSTALL MULTICLIC FLOORING


TIPS



Firm Mallet Taps

Use a rubber mallet to apply firm, controlled taps directly on the joint to engage the 2G locking system. Always strike from back to front to fully close the locking strip.
Avoid hitting the sides, as this can damage the locking system and create gaps.

Additional Foam Underlayment Impact

Soft foam underlayments may cause movement when walked on, which can loosen or open the joints over time. Do not install over a second underpad or any soft, compressible surface; doing so will cause excessive deflection and damage to the planks.

Dismantling 2G Planks

To safely remove the planks, start by lifting and removing the entire row. Then separate each plank by lifting at the joints one by one. This method helps prevent damage to the locking system.